[Free] Download New Updated (December) Microsoft 70-497 Exam Questions 1-10

Ensurepass

QUESTION 1

You are using Microsoft Test Manager (MTM).

 

You have a large list of existing test plans that are obsolete. These test plans should be kept for historical purposes. When testers click on the Home button to select a test plan, the list is too long to easily navigate.

 

You need to show only the test plans that are currently being used.

 

What should you do?

 

A.

In the Test Plan Manager view, right-click each obsolete test plan and select Hide.

B.

In the Test Plan Manager view, for each obsolete test plan select Delete test plan.

C.

In the test plan Properties, change the State to Inactive for each obsolete test plan.

D.

In the Test Plan Manager view, right-click each obsolete test plan and select Close.

E.

In the test plan Properties, change the State to Closed for each obsolete test plan.

 

Answer: C

Explanation:

If you do not want to delete a test plan and its associated test suites and test results, you can change the state of the test plan to inactive.

 

 

QUESTION 2

You are using Microsoft Test Manager (MTM).

 

An application that you are responsible for testing has been modified to include a new data entry field. This new field requires testing against a set of known test data.

 

You need to modify the manual test case to include input and validation data for the new data entry field to meet these requirements.

 

Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

 

A.

Create a new test case for each data value to be tested.

B.

Insert a test step insert a parameter into its action column to represent the input data value.

C.

Insert a test step insert a parameter into its Expected Results column to represent the expected result.

D.

Insert the action expected results values to the Parameter Values list pane.

E.

Insert a test step for each new result data value to be tested.

 

Answer: BCD

Explanation:

Add parameters to a test case

Create a parameter by typing a name preceded by “@” in the actions and expected results of your test steps.

Don’t forget to include the expected results.

 

clip_image002

 

Note:

* When you write a manual test, you often want to specify that the test should be repeated several times with different test data. For example, if your users can add different quantities of a product to a shopping cart, then you want to check that a quantity of 200 works just as well as a quantity of 1.

To do this, you insert parameters in your test steps. Along with the test steps, you provide a table of parameter values.

 

 

QUESTION 3

You are using Microsoft Test Manager (MTM) to run manual tests.

 

Testers reported a bug during a test run on the V1.0 build. A build for V2.0 has been created. Testers are still running tests against the V1.0 build.

 

You need to verify that the bug has been fixed in build V2.0.

 

What should you do?

 

A.

Change the default build for the test plan to V2.0 and run the test case.

B.

Run the test case with default settings; the latest build will be selected automatically.

C.

Change the build to V2.0 by using Run with options and run the test case.

D.

Change the build property for the test case to the V2.0 build and run the test case.

 

Answer: C

Explanation:

When we want to use the test settings we either assign it to the test plan or choose the test setting when we start a test run by selecting Run Options

 

clip_image004

 

 

QUESTION 4

DRAG DROP

Your company’s test team is working through their bug backlog and tracking their progress on the Bugs dashboard.

 

The bug backlog continues to grow, but the reports that appear on the Bugs dashboard are neither accurate nor useful.

 

You need to establish a best practice that will ensure the reports on the Bugs dashboard are accurate and useful.

 

Which four actions should you perform in sequence?

 

To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. More than one order of answer choices may be correct. You will receive credit for any of the correct orders you select.

 

clip_image006

 

Answer:

clip_image008

 

 

QUESTION 5

You are using Microsoft Test Manager (MTM). Your development team is using Team Foundation Server (TFS) 2012 to associate requirements with source code and to automate builds.

 

Your team has been testing against an old build. You want to assign a more recent automated build to the test plan.

 

You need to review the requirements that have been affected between the current build and the new build before assigning it to your test plan.

 

What should you do?

 

A.

In the Properties View of the Plan activity, click Modify the Build In Use. Select the appropriate build in the Available builds. Review the Associated work items between selected builds list.

B.

Set up a check-in policy that will force an association of a work item to the changeset.

C.

In the Assign Build view of the Track tab, click Modify. In Filter for builds, select the appropriate build to preview the list of work items.

D.

In the Queries view of the Track activity, create a custom query that lists all requirements that have the Fixed in Build field set to the new build. Run the build and review the results.

 

Answer: A

Explanation:

To select from the build candidates that you want to consider using for your test plan, you have to select a build filter for your test plan. After you have selected the build you are currently using to test, you can select a later build to see which work items have been associated with each of the builds between these two selected builds, as shown in the following illustration.

 

< a href="http://www.pass-exams.com/wp-content/uploads/2015/12/clip_image010-66.jpg">clip_image010

 

Reference: Determining Which Builds Have Bug Fixes, New Features, or Requirements

 

 

QUESTION 6

You plan to conduct a test for a multi-tier ASP.NET website using Microsoft Test Manager (MTM). You have created a test plan named QA Release 1.0. You also have created a test setting for the QA Release 1.0 test plan with the Database, Web Client, and Web Server roles.

 

The QA Release 1.0 test plan must specify that test runs:

 

clip_image012Collect specific diagnostic trace information to help analyze bugs that are difficult to reproduce, and

clip_image012[1]Collect information about which methods of your applications code were used when a test case was run.

 

You need to configure the QA Release 1.0 test plan to meet these requirements.

 

What should you do?

 

A.

Enable and configure the IntelliTrace, ASP.NET Client Proxy for IntelliTrace and Test Impact diagnostic data adapter settings.

B.

Enable and configure the IntelliTrace, ASP.NET profiler, and Event log diagnostic data adapter settings.

C.

Enable and configure the IntelliTrace, ASP.NET Client Proxy for IntelliTrace and Test Impact, and ASP.NET profiler diagnostic data adapter settings.

D.

Enable and configure the ASP.NET profiler, Code coverage, and IntelliTrace diagnostic data adapter settings.

 

Answer: A

Explanation:

Test Settings: Data and Diagnostics

* (needed) IntelliTrace : You can configure the diagnostic data adapter for IntelliTrace to collect specific diagnostic trace information to help isolate bugs that are difficult to reproduce

* (needed for Web Client – Web Server traffic) ASP.NET Client Proxy for IntelliTrace and Test Impact: This proxy allows you to collect information about the http calls from a client to a Web server for the IntelliTrace and Test Impact diagnostic data adapters.

* (needed) Test impact : You can collect information about which methods of your applications code were used when a test case was running. This information can be used together with changes to the application code made by developers to determine which tests were impacted by those development changes.


Reference: Specifying Test Settings for Visual Studio Tests

 

 

QUESTION 7

DRAG DROP

You are using Microsoft Test Manager (MTM) to manage customer service bug reports.

 

A customer has reported a problem and provided documentation of the steps to reproduce the problem.

 

You need to use exploratory testing to create a bug and associate the bug to a new test case.

 

What should you do?

 

To answer, move the five appropriate actions from the list of actions to the answer area and arrange them in the correct order.

 

clip_image014

 

Answer:

clip_image016

 

 

QUESTION 8

DRAG DROP

Your team uses Microsoft Test Manager to manage test cases. You are testing an ASP.NET MVC web application hosted on one of your internal servers, which is named WebSrv1. Your application connects to a SQL Server database hosted on a server named DBSrv1.

 

You want to configure your test plan so that it collects diagnostic data from your test machine and all servers used by your application.

 

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

 

clip_image018

 

Answer:

clip_image020

 

 

QUESTION 9

While reviewing a bug in Microsoft Test Manager (MTM), you realize there is no test case covering the bug.

 

You need to create a test case from the bug, including test steps, and associate it with the test case for future reference.

 

What should you do?

 

A.

In MTM, in the Verify Bugs activity, select the bug. Click Open test case.

B.

Open a Visual Studio 2012 window. Select the bug and click Open test case.

C.

In MTM, in the Verify Bugs activity, select the bug. Click Create test case from bug.

D.

Open a Visual Studio 2012 window. Create a test case and associate it with the bug.

 

Answer: C

Explanation:

Reference: How to: Use Recorded Actions in Bugs to Create Test Cases

 

 

QUESTION 10

You are using Microsoft Test Manager (MTM) to manage test cases.

 

You want to review all test cases with shared steps.

 

You need to build a direct links query that will generate a list of all test cases in the team project that use a shared step.

 

Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

 

A.

Set the linked work items filter to Work item type = Shared Steps.

B.

Set the main query to Team Project = @Project AND Work Item Type = Test Case.

C.

Return all top-level work items.

D.

Return only items that have the specified links.

E.

Return only items that do not have the specified links.

 

Answer: ABD

Explanation:

Q: How do I link test cases, shared steps, and test results?

A: The link types, Tested and Tested By are used to link test cases to work items, and Test Case and Shared Steps are used to link Shared steps to test cases. Using Microsoft Test Manager, you can create test cases and test plans which define and manage these associations. Also, Test Manager creates and manages the associations of test results to test cases and test plans.

 

Free VCE & PDF File for Microsoft 70-497 Real Exam

Instant Access to Free VCE Files: MCSE|MCSA|MCITP…
Instant Access to Free PDF Files: MCSE|MCSA|MCITP…