Question No.11

Magic Wand Corporation manufactures a range of equipment used by magician worldwide. The global popularity of a series of children#39;s books describing the formative years of a budding wizard and his various escapades at wizard school has driven unprecedented sales growth in the magical equipment market.

The current IT systems at Magic Wand are struggling to cope with the high volumes in this growth market. The CIO wants to persuade the board of Magic Wand Corporation to make a greater investment in the IT systems to cope with the new higher transaction volumes. On of the key components the CIOs wants to include when he approaches the board is a description of the current problems and how they may be addressed from an architectural point of view.

As the High Architect of Magic Wand Corporation, the CIO has delegated the task of creating a vision for the future Architecture to you.

Which of the following answers best describes how TOGAF recommends delivering an Architecture Vision for the CIO?

  1. Firstly, I ensure there is a Request for Architecture Work from the CIO. Then I ensure that there is recognition for the architecture vision project by following any project management and programmed management frameworks used within the organization. I would identify the key stakeholders and engage with them to understand and document their concerns and high-level requirements. This would result in a stakeholder map used to support other deliverables such as the Architecture Vision, a Communications plan and a Statement of Architecture Work. I would then identify the business goals and strategic drivers of the organization and define any enterprise or project specific constraints such as time and resources. I would then define the business capabilities of the organization needed to fulfill those business goals and drivers and their readiness for change. Once complete, I would define the scope, confirm the architecture and business principles and develop the Architecture Vision. Following this, I would define the business case for the architecture project, assess the business risks and produce a risk mitigation plan. I would then define a plan of enterprise architecture work to meet the scope in the desired time line and the resources required and secure the support of stakeholders.

  2. I would start by ensuring there is a Request for Architecture Work from the sponsor (the CIO). I would then create a project to define and deliver the architecture vision and the necessary outputs. The outputs include an approved Statement of Architecture Work, refined statements of Businesses Principles, Business Goals and Business Drivers, Architecture Principles, a Capability Assessment, a Tailored Architecture Framework, an Architecture vision, a Communications plan. The Statement of Architecture Work needs to be clear on the scope of architectural work, the resources needed to complete the work and amount of time it would take to complete the work assuming the scope of architectural work is agreed and that all the resources required are available. The final step would be to agree the Statement of Architectural Work with stakeholders confirming the scope, schedule and confirming the availability of the necessary resources.

  3. I would start by establishing the architecture project and follow the appropriate project management method. I would identify stakeholders their concerns and business requirements then confirm and elaborate the business goals, business drivers and constraints. I would then evaluate the business capabilities and readiness for business transformation and define the scope. I would then develop the architecture vision, define the target architecture value proposition, KPIs and identify and mitigate all risks associated with the transformation effort. Finally, I would develop an Enterprise Architecture Plan and Statement of Work and secure approval from the relevant stakeholders.

  4. I would approach this by defining and establishing the architecture team and governance. This would be followed by agreeing and establishing the architecture principles. I would select and customize an architecture framework changing any terminology and selecting the right phases and customizing the structure of content and outputs from the chosen method. Finally I would select and implement and architecture tools. The outputs from this work would include an Organization Model for Enterprise Architecture, a Tailored Architecture Framework including method and content, the Architecture Principles, an initial architecture repository, restatement or references to business principles, business goals and business driver, a request for architecture work and the governance framework.

Correct Answer: A

Question No.12

Scenario: MegaMart

Case Study Title (Case Study):

MegaMart is a Retail Chain which has expanded throughout India and the Far East.

The CEO and CIO decide that there is a crying need to put an Enterprise Architecture in place to realize MegaMart#39;s strategy to expand its revenue and diversify. The CIO has evaluated and decided to go in for TOGAF9 and adapt it to his enterprise requirements.

The Preliminary and Vision Phase have been completed.

As such very few architectural artifacts exist and the target architecture as of now is not very clear. As the Lead Architect how would you guide your team of architects for the

Business Architecture definition?

  1. In the first iteration start with the definition of the Target Business Architecture using a Top down Approach.

    Then keep on iterating in Phase B till the Target Business Architecture is refined before going to Phase C and Phase D. After Phase C and Phase D are over, iterate again to Phase B and define the baseline Business Architecture, analyze the gaps finalize the Architecture Definitions documents and proceed to Phase C and Phase D.

  2. In the first iteration start with the definition of the Baseline Business Architecture using a Top Down approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders. Then proceed to Phase C and Phase D. In the next iteration finalize the Target Business Architecture and proceed to Phase C and Phase D.

  3. In the first iteration start with the definition of the Baseline Business Architecture using a Bottom Up approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders鈥?

    Proceed to Phase C and Phase D. In the next iteration finalize the Target Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition document. after analyzing the impacts and reviewing with the stakeholders. Then proceed with the iteration.

  4. In the first iteration start with the definition of the Target Business Architecture using a Top Down approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders proceed to Phase C and Phase D. In the next iteration finalize the Baseline Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition document. After analyzing the impacts and reviewing with the stakeholders. Then proceed with the iteration.

Correct Answer: C

Question No.13

Carter Woods, a global furniture firm, wants to improve the efficiency of its sales force by replacing their legacy configuration and ordering systems based on manual and paper based processes with an online ordering platform.

Carter Woods uses the Architecture Delivery Method from TOGAF 9. The CIO sponsored this activity and the Baseline Architecture was defined on the initial iteration defining:

approach, scope and architectural vision including a set of architecture principles related to the Data domain:

image

image

image

Data is an asset. Data is shared. Data is accessible.

A set of aspects to clarify arose from the business analysis from the assumption to replace the legacy systems with an online centralized one. These main concerns are:

image

To identify the changes to existing business processes.

image

image

To identify the data entities that can be shared among the sales agents. To clarify how to keep the data secured.

image

To identify the list of non-sales application to be integrated with the sales applications Refer to the scenario above

You, as Lead Enterprise Architect, need to identify the most appropriate architecture viewpoints to address the concerns above mentioned.

Choose one of the following answers

  1. Depict the Business Architecture using a Role catalog and a Process/Event/Control/Product catalog. Depict the Data Architecture using a System/Data matrix, a Data Entity/Data Component catalog and Data Security diagram. Depict the Application Architecture using an Interface catalog. Define the Technology Architecture via a Network Computing/Hardware diagram.

  2. Depict the Business Architecture using a Business Interaction matrix and a Location catalog. Depict the Data Architecture using a Data Lifecycle diagram and a Data Migration diagram. Depict the Application Architecture using a Software Engineering diagram. Depict the Technology Architecture using a Communications Engineering diagram.

  3. Depict the Business Architecture using a Business Footprint diagram and a Location catalog. Depict the Data Architecture using a Data Migration diagram, System/Data matrix and Data Lifecycle diagram. Depict the Application Architecture using an Application Communication diagram. Depict the Technology Architecture using a Network Computing/Hardware diagram.

  4. Depict the Business Architecture using a Role catalog and Location catalog. Depict the Data Architecture using a System/Data matrix, Data Entity/Business Function matrix and Data Security diagram. Depict the Application Architecture using an Application Interaction matrix. Define the Technology Architecture via a Network Computing/Hardware diagram.

Correct Answer: A

Question No.14

Scenario: Zephyr Enterprises

Please read this scenario prior to answering the question

Zephyr Enterprises specializes in the development of wind turbine blades for use in large- scale commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturers design specifications.

Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.

Zephyr has a mature Enterprise Architecture organization that is supported by a cross- functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co- sponsor the Enterprise Architecture program.

Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.

An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.

Refer to the Zephyr Enterprises Scenario You are the Lead Architect for this activity.

You have been asked to recommend the best approach to adopt to address the Chief Engineer#39;s concern.

Based on TOGAF 9, which of the following is the best answer?

  1. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.

    You recommend that if a deviation from the contract is detected, the Manufacturing Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for

    Architecture Work to implement the modified Architecture Definition.

  2. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal envelopment projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.

    You recommend that if a deviation from the Architecture Contract is detected, the Manufacturing Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.

  3. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.

    You ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

  4. You create an Architecture Contract to govern the implementation and migration process at each site. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. You then schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. Based on the results, you ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

Correct Answer: C

Question No.15

Scenario: St. Croix Consulting

Please read this scenario prior to answering the question

St. Croix Consulting started as an accounting and financial services company. It has expanded over the years and is now a leading North American IT and Business Services provider.

With numerous practice areas and a multitude of diverse engagements underway at any given time, overall engagement management has become challenging. The company does not want to risk its outstanding reputation or its international certifications and CMM ratings. Senior partners must become team players, working to support the broader needs of the company and its shareholders.

The Enterprise Architecture team has been working to create St. Croixs Enterprise Architecture framework to address these issues. The team has defined a preliminary framework and held workshops with key stakeholders to define a set of principles to govern the architecture work. They have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period.

An Architecture Review Board has been formed comprised of IT staff executives and executives from the major practice areas.

The Enterprise Architecture framework is based on TOGAF 9.

The Chief Executive Officer and Chief Information Officer have co-sponsored the creation of the Enterprise Architecture program.

Refer to the St Croix Consulting Scenario:

You have been assigned to the role of Chief Enterprise Architect.

As the EA team prepares to formulate an Implementation plan, they have been asked by the CIO to assess the risks associated with the proposed architecture. He has received concerns from senior management that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the attendant risks.

You have been asked to recommend an approach to satisfy these concerns. Based on TOGAF 9, which of the following is the best answer?

  1. An interoperability analysis should be applied to evaluate any potential issues across the Solution Architecture. Once all of the concerns have been resolved, the EA team should finalize the Architecture Implementation Roadmap and the Migration Plan.

  2. The EA team should gather information about potential solutions from the appropriate sources. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.

  3. Prior to preparing the Implementation plan, the EA team should create a consolidated gap analysis to understand the transformations that are required to achieve the proposed Target Architecture. The EA team should gather information about potential solutions from the appropriate sources. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures. An interoperability analysis should be applied to evaluate any potential issues across the Solution Architecture.

  4. Prior to preparing the Implementation plan, there are several techniques that should be applied to assess the risks and value of the proposed transformation. In particular, the EA team should pay attention to the Business Transformation Readiness Assessment and the Business Value Assessment.

Correct Answer: C

Question No.16

Scenario:

Please read this scenario prior to answering the Question

You are the Lead Architect for a firm that manufactures ball bearings used in industrial equipment applications. They have manufacturing operations in several cities in the United States, Germany, and the United Kingdom.

The firm has traditionally allowed each manufacturing plant to drive its own production planning systems. Each plant has its own custom Materials Requirements Planning, Master Production Scheduling, Bill of Materials, and Shop Floor Control systems.

quot;Just In Timequot; manufacturing techniques are used to minimize wastes caused by excessive inventory and work in process. The increasingly competitive business environment has compelled the firm to improve its business capability to be more responsive to the needs of industrial customers. To support this capability, the firm has decided to implement an Enterprise Resource

Planning (ERP) solution that will enable it to better coordinate its manufacturing capacity to match the demands for its products across all plants. In addition, there are also new European regulations coming into force to which their manufacturing processes must conform in the next six months.

As part of the implementation process, the Enterprise Architecture (EA) department has begun to implement an architecture process based on TOGAF 9. The CIO is the sponsor of the activity.

The Chief Architect has directed that the program should include formal modeling using the Architecture Content Framework and the TOGAF Content Metamodel. This will enable support for the architecture tooling that the firm uses for its EA program.

The Chief Architect has stated that in order to model the complex manufacturing process it will be necessary to model processes that are event-driven. Also, in order to consolidate applications across several data centers it will be necessary to model the location of IT assets. In particular, the end goal is to have the single ERP application running in a single data center.

Currently the project is in the Preliminary Phase, and the architects are tailoring the Architecture Development Method (ADM) and Architecture Content Framework to fit into the corporate environment.

Refer to the Scenario

You have been asked to recommend a response to the Chief Architect#39;s request to tailor the TOGAF Content Metamodel.

Based on TOGAF 9, which of the following is the best answer?

  1. You recommend that the architecture team incorporate the Process Modeling and Infrastructure Consolidation extensions into their tailored Content Metamodel. As the environment is process- centric this will enable them to model the manufacturing processes and store information to support regulatory compliance. It also includes views useful for managing the consolidation of applications into a single data center.

  2. You recommend that the architecture team incorporate the Process Modeling and Governance extensions into their tailored Content Metamodel. This is suitable as this is a significant IT change that will impact its operational models. This will ensure that they include specific entities and attributes that will allow them to model the event-driven nature of the manufacturing processes more precisely.

  3. You recommend that the architecture team incorporates the Governance and Motivation Extensions into their tailored Content Metamodel. This would allow modeling of the target milestones they want to achieve with this consolidation of application to a single data center. These extensions will also enable demonstration of regulatory compliance for the manufacturing process.

  4. You recommend that the architecture team incorporates the Data and Services Extensions into their tailored Content Metamodel. This would allow modeling of the location of IT assets and ensure regulatory compliance for the manufacturing process. It will also allow for identification of redundant duplication of capability which will be needed for a successful consolidation to a single data center.

Correct Answer: A

Question No.17

Scenario:

Please read this scenario prior to answering the Question

You are serving as the Chief Architect for a large, global commodities trading company which has been growing rapidly through a series of acquisitions. Each business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to quot;leverage the synergiesquot; that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error- prone. As a result, the company has made the decision to introduce a single enterprise-wide application to consolidate information from several applications that exist across the lines of business. The application will be used by all business units and accessed by suppliers through well defined interfaces.

Refer to the Scenario

As part of the process for establishing the Enterprise Architecture department, you are developing a set of architecture principles to guide the activities. You need to specify the best approach for this work. Based on TOGAF 9, which of the following is the best answer?

  1. You gather information from credible industry sources in the commodities business. Based on that, you assess current trends and apply that to defining a set of principles that embody best practices. You select architecture principles that do not conflict with each other and that should be stable. You ensure that all the principles are realistic and avoid including principles that are obvious.

  2. You examine the mission statements for the company and each of its businesses, together with the corporate value statements. Based on that, you define a set of principles and review with the CIO. When developing the principles you ensure that they actively promote the alignment of IT with the business strategies and initiatives of the company. You then seek the endorsement of the CIO and senior management.

  3. You define a set of principles that support the preferred best practices embodied in the Enterprise Architecture department charter. You publish the principles on the corporate intranet to ensure widespread acceptance and compliance. You then schedule regular periodic Compliance Assessments with individual business units to check that they have made satisfactory progress toward meeting the objectives and conditions embodied in the principles.

  4. You examine the mission statements for the company and each of its businesses, together with the corporate value statements. Based on that, you work with the Architecture Board to define the principles.

When developing the principles you ensure that they actively promote the alignment of IT with the corporate business strategies. You then hold a series of review meetings with all the relevant stakeholders, including senior management, ensuring their support.

Correct Answer: D

Question No.18

ARTI Dimensioning is a multinational that operates production facilities in 29 countries and sells its products in over 120 countries.

A consultancy firm has recommended a realignment that will enhance sharing of product information across business units. The implementation of this strategic realignment will require the development of integrated customer information systems and product information systems.

ARTI has a mature enterprise architecture practice and uses TOGAF 9 for the basis of the ARTI Architecture Framework (method and deliverables). The CIO is sponsoring an architecture

development program that is going to start. The CIO is concerned about a potential disruptive result to the business of this activity and before proceeding with the architecture development he asked to evaluate the impacts on the company business.

Refer to the scenario above You are the Lead Architect and you have been asked to recommend an approach to address the concerns raised. Based on TOGAF 9 recommend which of the following is the best answer. Choose one of the following answers.

  1. Risk Aversion Assessment should be conducted during the Implementation Governance phase to determine the degree of risk aversion of the proposed business transformation. After sharing the residual level of risk with the company chairman and the residual risk is not accepted, a set of parallel systems will be implemented to mitigate the risks.

  2. Your recommendation is to use risk management techniques to assess the risks associated with the proposed business transformation and ensure the existence of business continuity plans. During the Implementation Governance phase you conduct a residual risk assessment to manage risks that cannot be mitigated.

  3. During the Architecture Vision phase a risk assessment is conducted to mitigate initial risks and address those in the Architecture Contract signed in the Implementation Governance phase.

  4. Your proposal is to utilize a risk management framework during the Implementation Governance phase to verify the risks associated with the proposed transformation of the business. You then share with the concerned stakeholders the residual level on risk before the Architecture Contracts are released.

Correct Answer: B

Question No.19

Patterns amp; Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.

Patterns amp; Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation. The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.

Refer to the scenario above As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9. Choose one of the following answers

  1. You ask the supplier to modify the web server hardware and software components so they can meet the current infrastructure standards. You advise to execute a proof of concept to anticipate any coding issue. Then, after the agreement with the development leads for supporting the development, you will provide the project plan to the project manager and develop an Architecture Contract. A set of frequent operational reviews to monitor the solution#39;s performance is then scheduled after the implementation is completed.

  2. You recommend the co-existence of a second web server standard and modify the company Standards Information Base adding this new technology.You ask the project architects to create an Architecture Contract with the development teams. You identify the need of a performance testing and a compliance review You agree with the business on SLA and delivery dates. You identify re-usable procedures and objects.

  3. You eliminate the non-standard web server from the solution as recommended by the Architecture Board. You create a revised plan and Architecture Contract for the development stressing the re- use of standard technologies. You share the budget implication of this solution with a finance

    committee and inform the CIO of the long term cost benefits of this choice. You define periodical project management meetings to monitor compliance.

  4. You execute a risk analysis and set deliverables and timing requirements with the development team. You implement a detailed impact analysis of the chosen solution. You create an Architecture Contract and ask for the CIO#39;s approval before implementing it. You test the solution just prior to implementation and deliver the project artifacts and store after the completion of the implementation.

Correct Answer: B

Question No.20

Worldwide Mobile is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer.

Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing group has published some new finding about customer satisfaction. The customers appear to be switching to Air Light, a competitor, because of superior customer service. WorldwideMobile actually has better coverage in nearly all markets than Air Light, and good roaming agreement that keep rates low for business travellers. But customer satisfaction has remained low.

The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan. They have developed a business scenario which contains a good conceptual model of what needs to be done and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board.

The planning for the program has been underway for several months. WorldwideMobile has selected TOGAF 9 as the basis for its Enterprise Architecture.

The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation. The Executive Council has stated that the program should define specific initiatives to enable each regional business units to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.

Refer to WorldwideMobile-2 Scenario

You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.

The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At present time, the project team is conducting an architecture development project that is focused on the customer self service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.

The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.

You have been asked to recommend the course of action to complete the project. Based on TOGAF 9, which of the following is best answer?

  1. In the remaining architecture definition phases, the project team should map out the capability in the Technology domain. In the Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architecture. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository. The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will conduct Compliance Assessments to ensure that the Target Architecture is properly implemented.

  2. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture. The resulting Solution Building Blocks will then provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conduction Compliance Assessments.

  3. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information System and Technology domains. In the Phases E and F, the capability should be broken down into a set of increments that defines the Target Architecture. The Solution Building Blocks will provide the basis for the capability increment solutions. The complete Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.

  4. The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture. The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approval. Upon approval, the implementation team will conduct Compliance Assessments to ensure that the self-service capability is compliant with the overall Enterprise Architecture.

Correct Answer: B