[Free] 2019(Nov) EnsurePass iSQI CTFL_001 Dumps with VCE and PDF 301-310

Get Full Version of the Exam
http://www.EnsurePass.com/CTFL_001.html

Question No.301

Which of the following test design techniques is classified as a structure-based (white box) technique?

  1. Exploratory testing

  2. Decision table testing

  3. State transition testing

  4. Statement testing

Correct Answer: D

Question No.302

Why is independent testing important?

  1. Because independent testers make fewer assumptions than developers

  2. Because independent testers are isolated from the development team

  3. Because independent testers can verify assumptions made during specification and implementation of the system

  4. Because independent testers have a greater sense of responsibility for quality than developers

Correct Answer: C

Question No.303

Which statement BEST describes when test planning should be performed?

  1. Test planning is performed only once, at the beginning of the life cycle, and generates a Master Test Plan

  2. Test planning is performed at the beginning of the life cycle and again at the beginning of test execution

  3. Test planning is performed at the beginning of the life cycle and again at every test level

  4. Test planning is performed continuously in all life cycle processes and activities

Correct Answer: D

Question No.304

Refer to the exhibit. The following test cases need to be run, but time is limited, and it is possible that not all will be completed before the end of the test window

image

The first activity is to run any re-tests, followed by the regression test script. Users have supplied their priority order to tests.

Which of the following gives an appropriate test execution schedule, taking account of the prioritization and other constraints?

  1. b, c, g, d, e, i, a, f, h

  2. a, c, d, b, g, e, i, f, h

  3. c, a, d, b, e, g, i, h, f

  4. d, c, a, e, b, g, i, f, h

Correct Answer: C

Question No.305

Which of the following factors will MOST affect the testing effort required to test a software product?

  1. The number of staff available to execute tests

  2. The level of detail in the test plan

  3. The requirements for reliability and security in the product

  4. The test estimation method used

Correct Answer: C

Question No.306

Which of the following metrics could be used to monitor progress along with test preparation and execution?

  1. The total number of tests planned

  2. The total number of requirements to be tested

  3. The failure rate in testing already completed

  4. The number of testers used for test execution so far

Correct Answer: C

Question No.307

Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels.

Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met?

  1. Regression tests run and passed in systems testing

  2. Incidents closed in systems testing

  3. Planned tests run and passed in system testing

  4. Planned tests run and passed at all levels of testing

  5. Incidents raised and closed at all levels of testing

  1. a and e

  2. b and c

  3. d and e

  4. a and b

Correct Answer: A

Question No.308

Test script TransVal 3.1 tests transaction validation via screen TRN 003B. According to the specification (PID ver 1.3 10b iv) the validation screen should not accept future dated transactions. Test script TransVal 3.1 passes. Test script eod 1.4 tests end of day processing and is run after the execution of TransVal 3.1 using data entered during that test. Which of the following is the BEST detail on an incident report?

  1. Title. End of Day failure. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached.

  2. Title. Transaction input screen validation..Reproducible. Yes. Description. Script eod 1..4 fails. Screen shot of the failure attached. Validation of transaction entryon screen TRN-003B should not

    allow future dated transactions ?see PID ver 1.3 para 10b iv.

  3. Title. Screen TRN-003B validation of transaction date. Reproducible. No. Description. When a future dated transaction is processed by the end of day process, a failure can occur. This does not always happen. Screen shot of the failure attached.

  4. Title. Screen TRN-003B validation of transaction date. Reproducible. Yes. Description. Script eod

1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached. Validation of transaction entry on screen TRN-003B should not allow future dated transactions ?see PID ver 1.3 para 10b iv.

Correct Answer: D

Question No.309

Which TWO of the following test tools would be classified as test execution tools?

  1. Test data preparation tools

  2. Test harness

  3. Review tools

  4. Test comparators

  5. Configuration management tools

  1. a and b

  2. c and d

  3. c and e

  4. b and d

Correct Answer: D

Question No.310

Which of the following is a consideration when deploying test execution tools?

  1. Data-driven testing cannot be used with test execution tools

  2. Recorded manual tests may become unstable in use

  3. Keyword-driven testing cannot be used with test execution tools

  4. Expected results for tests are not required because the tool generates expected results

Correct Answer: B

Get Full Version of the Exam
CTFL_001 Dumps
CTFL_001 VCE and PDF

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.