[Free] 2019(Nov) EnsurePass iSQI CTFL_001 Dumps with VCE and PDF 251-260

Get Full Version of the Exam
http://www.EnsurePass.com/CTFL_001.html

Question No.251

The selection of test cases for regression testing..?

  1. Requires knowledge on the bug fixes and how it affect the system

  2. Includes the area of frequent defects

  3. Includes the area which has undergone many/recent code changes

  4. All of the above

Correct Answer: D

Question No.252

What are the key features to be concentrated upon when doing a testing for world wide web sites?

  1. Interaction between html pages

  2. Performance on the client side

  3. Security aspects

  4. All of the above

Correct Answer: D

Question No.253

What if the project isn#39;t big enough to justify extensive testing?

  1. Use risk based analysis to find out which areas need to be tested

  2. Use automation tool for testing

  3. Both a and b

  4. None of the above

Correct Answer: A

Question No.254

Who is responsible for conducting test readiness review?

  1. Project Manager

  2. Test Engineer

  3. Test Manager

  4. None of the above

Correct Answer: C

Question No.255

Faults found by users are due to..?

  1. Poor quality software

  2. Poor software and poor testing

  3. Bad luck

  4. Insufficient time for testing

Correct Answer: B

Question No.256

Which of the following is the odd one out..?

  1. White box

  2. Glass box

  3. Structural

  4. Functional

Correct Answer: D

Question No.257

When what is visible to end-users is a deviation from the specific or expected behavior, this is called..?

  1. An error

  2. A fault

  3. A failure

  4. A defect

  5. A mistake

Correct Answer: C

Question No.258

Which of the following is NOT part of configuration management..?

  1. Status accounting of configuration items

  2. Auditing conformance to ISO9001

  3. Identification of test versions

  4. Record of changes to documentation over time

  5. Controlled library access

Correct Answer: B

Question No.259

A tool that supports traceability, recording of incidents or scheduling of tests is called..?

  1. A dynamic analysis tool

  2. A test execution tool

  3. A debugging tool

  4. A test management tool

  5. A configuration management tool

Correct Answer: D

Question No.260

The four test levels defined for a common V-model testing approach are:

  1. Unit, integration, system and maintenance.

  2. Functional, glass box, incremental and maintenance.

  3. Component, integration, system and acceptance.

  4. Unit, component, functional and alpha/beta.

Correct Answer: C

Get Full Version of the Exam
CTFL_001 Dumps
CTFL_001 VCE and PDF

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.